Cantons › Graubünden › Scuol
New-build projects in Scuol
Planned, authorised and started buildings from the official building register, plus building permit applications and forced auctions. As of 11.10.2026.
In brief
In Scuol (canton of Graubünden), the Federal Register of Buildings and Dwellings lists 46 buildings that are planned or under construction: 14 projected, 10 authorised and 22 under construction. Together they include 149 planned dwellings. As of 11.10.2026.
Buildings planned and under construction
All projects, under construction first, then by number of dwellings.
| Address | Status | Dwellings |
|---|---|---|
| Stradun 328 | under construction | 20 |
| Schinnas Sot 30 | under construction | 8 |
| Via da Pedra Grossa 31 | under construction | 6 |
| Via da Rachögna 15 | under construction | 4 |
| Vulpera | under construction | 3 |
| Curtin Sot 31 | under construction | 3 |
| Avrona 16 | under construction | 2 |
| Palüzot 3 | under construction | 2 |
| Via da Liuns 750a | under construction | 1 |
| Via da Manaröl 601a | under construction | 1 |
| Crastuoglia Sura 12a | under construction | 1 |
| Via da Pracom 198j | under construction | – |
| Via da Runà | under construction | – |
| Avrona 9.2 | under construction | – |
| Avrona 18.1 | under construction | – |
| Val Trigl 973 | under construction | – |
| Via da Liuns 4.2 | under construction | – |
| Via da Pedra Grossa 5.2 | under construction | – |
| Via Maistra 88.2 | under construction | – |
| Via da l'Ospidal 8.1 | under construction | – |
| Tanter Auals 34.1 | under construction | – |
| Via da la Dmura 4 | under construction | – |
| Via da l'Ospidal 290b | authorised | 6 |
| Tanter Vias | authorised | 4 |
| Curtin 19 | authorised | 3 |
| Via da Sotchà 26 | authorised | 2 |
| Vidos 12 | authorised | 2 |
| Sgnè 32.1 | authorised | – |
| Via da Ftan 135 | authorised | – |
| La Motta 28.1 | authorised | – |
| Curtin 19.1 | authorised | – |
| Pracom 10.1 | authorised | – |
| Via da Rachögna 6 | projected | 30 |
| Via da Rachögna 4 | projected | 30 |
| Pradatsch 23 | projected | 6 |
| Pradatsch 17 | projected | 3 |
| Sur Chafarrer 11 | projected | 3 |
| Via Sura 64 | projected | 3 |
| Pradatsch 15 | projected | 2 |
| Porta 53 | projected | 2 |
| Pradatsch 19 | projected | 1 |
| Vi 50.2 | projected | 1 |
| Via Sot Ruinas 1 | projected | – |
| Via da Rachögna 8 | projected | – |
| Via da Pradella 11.7 | projected | – |
| Plaz 37.1 | projected | – |
Frequently asked questions about Scuol
How many new-build projects are there in Scuol?
In Scuol (canton of Graubünden), the Federal Register of Buildings and Dwellings lists 46 buildings that are planned or under construction: 14 projected, 10 authorised and 22 under construction. Together they include 149 planned dwellings. As of 11.10.2026.
Where can I find building permit applications in Scuol?
Building permit applications from Scuol are published in the official gazette of the canton of Graubünden or by the municipality. Vorbau doesn’t analyse this canton’s building permit applications yet, but you can see the planned buildings from the building register on the map.
How do I find out about new building projects in Scuol?
With an alert on vorbau.ch: draw an area around Scuol on the map and you’ll get an email as soon as a building there is newly registered, authorised, started or completed. One alert is free.
Other municipalities in the canton of Graubünden
Sources: Federal Statistical Office, Federal Register of Buildings and Dwellings (RBD); cantonal official gazettes via amtsblattportal.ch; SOGC. Planned buildings may change or not go ahead.